Pepsico

Loading Systems supplied full docking solutions at the Pepsico facility near the Sheremetyevo airport, one of Moscow’s biggest airports.

The 10.000 square meter plant is equipped with complete docking solutions containing our swing lip dock levellers, sectional overhead doors and curtain dock shelters.

The great cooperation with the client throughout the project was even endorsed by a letter of appreciation from Pepsico.

Letter of appreciation:
 English
Russian

© Loading Systems 2017